Solar PV installation ON!


Approved and ready to go, our solar grid connect system is now turned on and generating power back to the grid!

Once the local authority had done their inspection it was just a matter of flicking a couple of switches and things have started happening.

The control panel on the inverter shows the daily and total power produced as well as the instantaneous output at any given moment.

control panel for inverter

instantaneous power output – showing 1540 watts

The feed-in tariff has yet to be officially confirmed as being approved but it is in process.

Next on the list is the solar hot water service. Just in time too, as the electric water heater just sprung a leak! But that’s another story.

Brian.

Advertisements

Tags: , , , ,

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s


%d bloggers like this: